Weir Canyon Honda

8323 E La Palma Ave Anaheim, CA 92807

2023 BMW M5 Base at Weir Canyon Honda

2023 BMW M5 Base

Selling Price : $82,995

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M5
  • Condition : Used
  • Mileage : 30,249
  • VIN : WBS83CH00PCM91400
  • Stock # : 00424165
  • Engine :
  • Transmission : 8-Speed Automatic Sport
  • Ext. Color : Gray
  • Int. Color : BLACK
  • Vehicle Type : Sedan
  • Body Style : 4D Sedan
  • Drivetrain : AWD
City MPG * 15 Hwy MPG * 21

*Your mileage will vary depending on driving conditions, how you drive and maintain your vehicle, battery-pack age/condition, and other factors.

2023 BMW M5 Sedan Executive Package, Driving Assistance Professional Package 4.4L V-8 direct injection, DOHC, variable valve control, twin turbo producing 600HP paired with an 8-speed automatic; premium gasoline. This high-performance luxury sedan combines near-supercar acceleration with the everyday usability expected from a modern performance sedan while maintaining competitive fuel economy for its segment. Price has just been reduced by $1,000, presenting a timely saving act quickly, as well-optioned M5s are in strong demand and inventory tends to move fast. This vehicle was a prior lease.

Executive Package enhances the overall cabin experience by delivering added refinement, passenger comfort and convenience features that make both long journeys and daily drives feel more luxurious and effortless.

Driving Assistance Professional Package brings a comprehensive set of advanced driver aids designed to reduce stress in highway and heavy-traffic situations, helping you stay relaxed and focused behind the wheel.

Wireless Apple CarPlay and Android Auto keep navigation, calls and entertainment accessible through the cars systems so you can stay connected without distraction.

Hands-off steering assist with lane centering lowers driver workload on long highway runs by helping maintain lane position and a safe following distance when road conditions allow.

Extended Traffic Jam Assistant smooths stop-and-go commutes by managing speed, spacing and appropriate lane changes, making congested drives far less fatiguing.

Forward collision mitigation continuously scans the road ahead and can ready or intervene to help avoid or reduce the severity of frontal impacts, boosting everyday safety.

Front pedestrian impact prevention increases urban awareness by detecting pedestrians near the vehicle and taking steps to reduce the risk of collisions in busy environments.

Unresponsive driver assist acts as an emergency safeguard by recognizing prolonged driver inactivity and bringing the vehicle to a controlled stop while alerting the appropriate systems.

Built-in mobile hotspot supplies reliable in-car Wi-Fi so passengers can stream, work or stay online without using their personal data plans.

A rear camera improves visibility when reversing and helps you maneuver into tight spaces with greater confidence.

Lane departure prevention intervenes to correct unintended drift, helping keep the vehicle centered in its lane and reducing the chance of accidental lane excursions.

Rear collision mitigation monitors traffic behind the car and prepares vehicle systems to respond, aiming to lessen the consequences of a potential rear impact.

Delivering 600 horsepower, thoughtful luxury refinements and a broad safety and connectivity toolkit, this 2023 BMW M5 Sedan is built for drivers who want both excitement and everyday practicality. With the recent $1,000 p

Dealership Info:

Weir Canyon Honda

Weir Canyon Honda

Vehicle Features

  • Navigation System
  • Connected Package Pro
  • Driving Assistance Professional Package
  • Executive Package
  • 16 Speakers
  • AM/FM radio: SiriusXM
  • harman/kardon Surround Sound System
  • harman/kardon® Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • SiriusXM Satellite Radio w/1 Year Subscription
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • Rear air conditioning
  • Rear dual zone A/C
  • Rear window defroster
  • Heads-Up Display
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote keyless entry
  • Steering wheel memory
  • Steering wheel mounted audio controls
  • Adaptive suspension
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Low tire pressure warning
  • M Compound Brakes w/Black Calipers
  • Occupant sensing airbag
  • Overhead airbag
  • Rear anti-roll bar
  • Soft-Close Automatic Doors
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Rear-View Camera
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Extended Traffic Jam Assistant
  • Speed control
  • Auto-dimming door mirrors
  • Bumpers: body-color
  • Heated door mirrors
  • Power door mirrors
  • Spoiler
  • Standard Emblems (DISC)
  • Turn signal indicator mirrors
  • Active Driving Assistant Pro
  • Active Park Distance Control
  • Aluminum Dark Carbon Structure Trim
  • Apple CarPlay & Android Auto Compatibility
  • Auto tilt-away steering wheel
  • Auto-dimming Rear-View mirror
  • BMW Assist eCall
  • BMW TeleServices
  • ConnectedDrive Services
  • Drive Recorder
  • Driver door bin
  • Driver vanity mirror
  • Front reading lights
  • Garage door transmitter
  • Gesture Control
  • Heated steering wheel
  • Illuminated entry
  • Leather Shift Knob
  • Leather steering wheel
  • Live Cockpit Pro w/Navi
  • Outside temperature display
  • Parking Assistant Plus
  • Passenger vanity mirror
  • Rear reading lights
  • Rear seat center armrest
  • Sport steering wheel
  • Surround View w/3D View
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • WiFi Hotspot
  • Wireless Charging
  • Extended Merino Leather Upholstery
  • Front & Rear Heated Seats
  • Front Bucket Seats
  • Front Center Armrest
  • Front Massaging Seats
  • Front Ventilated Seats
  • Heated Front Seats
  • Heated front seats
  • Multi-Function Seats w/Lumbar Support
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 19" x 9.5" Fr & 19" x 10.5" Rr Bi-Color
  • Wheels: 20" x 9.5" Fr & 20" x 10.5" Rr Black
  • Power Rear Sunshade & Rear Side Window Shades
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.