2023 BMW M4 Competition at Weir Canyon Honda
https://research.weircanyonhonda.com/cars/Used/2023/BMW/M4/Competition/160447712023 BMW M4 Competition
Selling Price : $75,995
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 8,752
- VIN : WBS33AZ0XPCM25286
- Stock # : 00422348
- Engine :
- Transmission : 8-Speed Automatic Steptronic
- Ext. Color : White
- Int. Color : BLACK
- Vehicle Type : Coupe
- Body Style : 2D Coupe
- Drivetrain : RWD
City MPG *
16
Hwy MPG *
23
*Your mileage will vary depending on driving conditions, how you drive and maintain your vehicle, battery-pack age/condition, and other factors.
The 2023 BMW M4 Competition with the premium Parking Assistance Package has recently seen a price drop of $2,000, making this an exceptional time to consider this high-performance vehicle. This limited-time price reduction creates an unparalleled opportunity for enthusiasts seeking luxury and performance in one impressive package. Dont wait too long, as this deal wont last forever!
The BMW M4 Competition is a masterpiece of engineering, powered by a robust 3L I-6 gasoline direct injection engine that delivers an exhilarating 503 horsepower. Coupled with an 8-speed automatic transmission, it ensures smooth acceleration and precise handling, making every drive a thrilling experience whether youre cruising through the city or tackling winding roads.
Safety is a top priority in the M4 Competition, featuring cutting-edge technologies designed to protect both the driver and passengers. The forward collision mitigation system actively scans the road, ready to respond if an impact is imminent, exemplifying BMWs commitment to proactive safety measures. This feature is crucial for reducing the severity of potential accidents.
Moreover, the advanced front pedestrian impact prevention system continuously monitors for pedestrians, projecting essential information onto an interior display. This system takes immediate action to avoid collisions, showcasing BMWs innovative approach to safety. The rear camera further enhances visibility, ensuring that reversing or navigating tight spaces is both safe and effortless.
Equipped with a rear collision mitigation system, the M4 Competition uses sensors to monitor the area behind you. If it detects any potential hazards, it activates necessary features to help prevent or minimize the impact of a collision, reinforcing the vehicles dedication to safety. Additionally, brake assist technology enhances emergency stopping power by sensing panic braking and applying maximum force, a critical feature that can avert accidents.
Convenience is also a hallmark of the M4 Competition. The voice-activated integrated navigation system guides you seamlessly to your destination, while cruise control with steering wheel-mounted controls adds comfort on long journeys. Heated driver and front passenger seats offer warmth during colder months, and selective internet access keeps you connected to your favorite news and updates.
In conclusion, the 2023 BMW M4 Competition, enhanced by the Parking Assistance Package, is the epitome of luxury, power, and advanced safety features. Dont miss this golden opportunity to elevate your driving experienceact quickly to secure your M4 Competition and embrace the ultimate in automotive excellence today!
The BMW M4 Competition is a masterpiece of engineering, powered by a robust 3L I-6 gasoline direct injection engine that delivers an exhilarating 503 horsepower. Coupled with an 8-speed automatic transmission, it ensures smooth acceleration and precise handling, making every drive a thrilling experience whether youre cruising through the city or tackling winding roads.
Safety is a top priority in the M4 Competition, featuring cutting-edge technologies designed to protect both the driver and passengers. The forward collision mitigation system actively scans the road, ready to respond if an impact is imminent, exemplifying BMWs commitment to proactive safety measures. This feature is crucial for reducing the severity of potential accidents.
Moreover, the advanced front pedestrian impact prevention system continuously monitors for pedestrians, projecting essential information onto an interior display. This system takes immediate action to avoid collisions, showcasing BMWs innovative approach to safety. The rear camera further enhances visibility, ensuring that reversing or navigating tight spaces is both safe and effortless.
Equipped with a rear collision mitigation system, the M4 Competition uses sensors to monitor the area behind you. If it detects any potential hazards, it activates necessary features to help prevent or minimize the impact of a collision, reinforcing the vehicles dedication to safety. Additionally, brake assist technology enhances emergency stopping power by sensing panic braking and applying maximum force, a critical feature that can avert accidents.
Convenience is also a hallmark of the M4 Competition. The voice-activated integrated navigation system guides you seamlessly to your destination, while cruise control with steering wheel-mounted controls adds comfort on long journeys. Heated driver and front passenger seats offer warmth during colder months, and selective internet access keeps you connected to your favorite news and updates.
In conclusion, the 2023 BMW M4 Competition, enhanced by the Parking Assistance Package, is the epitome of luxury, power, and advanced safety features. Dont miss this golden opportunity to elevate your driving experienceact quickly to secure your M4 Competition and embrace the ultimate in automotive excellence today!
Our dealership is your top choice for quality vehicles, serving Irvine, Riverside, San Bernardino, Yorba Linda, Anaheim Hills, and Corona with a vast selection and exceptional customer service. Discover
Vehicle Features
- Navigation System
- M Driver's Package
- Parking Assistance Package
- 16 Speakers
- AM/FM radio: SiriusXM
- harman/kardon Surround Sound System
- harman/kardon® Speakers
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM Satellite Radio
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear air conditioning
- Rear window defroster
- Lumbar Support
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote keyless entry
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Knee airbag
- Low tire pressure warning
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Speed control
- Auto-dimming door mirrors
- Bumpers: body-color
- Heated door mirrors
- Parking Assistant Plus
- Power door mirrors
- Spoiler
- Turn signal indicator mirrors
- Apple CarPlay & Android Auto Compatibility
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW TeleServices
- Carbon Fiber Trim
- Compass
- ConnectedDrive Services
- Driver door bin
- Driver vanity mirror
- Enhanced USB/Bluetooth Plus Smartphone Integration
- Front reading lights
- Garage door transmitter
- Illuminated entry
- Leather Shift Knob
- Live Cockpit Pro w/Navi
- Outside temperature display
- Overhead console
- Passenger vanity mirror
- Rear reading lights
- Rear seat center armrest
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Extended Merino Leather Upholstery
- Front Bucket Seats
- Front Center Armrest
- Heated Front Seats
- Heated front seats
- M Sport Seats
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.