Weir Canyon Honda

8323 E La Palma Ave Anaheim, CA 92807

2021 BMW M2 Competition at Weir Canyon Honda

2021 BMW M2 Competition

Selling Price : $56,495

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M2
  • Condition : Used
  • Mileage : 36,526
  • VIN : WBS2U7C06M7H65918
  • Stock # : 00423387
  • Engine :
  • Transmission : 6-Speed Manual
  • Ext. Color : Silver
  • Int. Color : BLACK/ORANGE STITCHING
  • Vehicle Type : Coupe
  • Body Style : 2D Coupe
  • Drivetrain : RWD
City MPG * 18 Hwy MPG * 24

*Your mileage will vary depending on driving conditions, how you drive and maintain your vehicle, battery-pack age/condition, and other factors.

Introducing the 2021 BMW M2 Competition, a remarkable high-performance vehicle that has recently seen a price drop of $500. This is your chance to act quickly and seize the opportunity to own a luxury sports car that masterfully blends speed and sophistication.

Under the hood, the M2 Competition is powered by a robust 3L I-6 gasoline engine with direct injection, DOHC, Double VANOS variable valve control, and TwinPower twin-turbo technology, delivering an exhilarating 405 horsepower paired with an engaging 6-speed manual transmission. This combination is not just about raw power; its about the thrill of driving that true enthusiasts crave.

Safety is paramount in the M2 Competition, equipped with cutting-edge features designed to protect both you and pedestrians. The Forward Collision Mitigation system actively monitors for potential collisions and engages safety mechanisms to reduce impact severity. Another critical feature is the Front Pedestrian Impact Prevention, which constantly scans the road for pedestrians, taking proactive measures to prevent accidents.

Convenience is elevated with the Rear Camera, providing a clear view of obstacles behind the vehicle for safer reversing. Additionally, the Brake Assist feature senses panic braking situations, applying maximum stopping power to help avert accidents, ensuring your overall safety on the road.

Long drives become effortless with the Cruise Control with Steering Wheel Mounted Controls, allowing you to set your desired speed and enjoy the journey without constant adjustments. Navigating to your destination is a breeze thanks to the Voice Activated Integrated Navigation System, which provides seamless turn-by-turn directions.

Comfort is a priority in the M2 Competition. The Heated Driver and Front Passenger Seats offer targeted warmth during colder months, while the luxurious Leather Seat Upholstery enhances the cabin experience. The intuitive Touchscreen interface allows for easy control of various vehicle features, making every drive more enjoyable.

In conclusion, the 2021 BMW M2 Competition is an outstanding vehicle that harmonizes high-performance engineering with an array of advanced safety and convenience features. With its remarkable specifications and premium amenities, it stands out as an exceptional choice for those seeking an exhilarating driving experience without compromising on comfort or safety. Dont miss out on this opportunity to own a truly exceptional automobileexperience the thrill of driving like never before!

Our dealership is your top choice for quality vehicles, serving Irvine, Riverside, San Bernardino, Yorba Linda, Anaheim Hills, and Corona with a vast selection and exceptional customer service. Discover unbeatable prices and flexible financing options that make finding your perfect car in Southern California both easy

Dealership Info:

Weir Canyon Honda

Weir Canyon Honda

Vehicle Features

  • Navigation System
  • Executive Package
  • 12 Speakers
  • AM/FM radio: SiriusXM
  • AM/FM Stereo
  • harman/kardon® Logic 7® Digital Surround
  • harman/kardon® Speakers
  • Radio Control US
  • Radio data system
  • SiriusXM Satellite Radio
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • Rear window defroster
  • Lumbar Support
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote keyless entry
  • Steering wheel mounted audio controls
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Knee airbag
  • Low tire pressure warning
  • Occupant sensing airbag
  • Overhead airbag
  • Rear anti-roll bar
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Automatic High Beams
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Speed control
  • Adaptive Full LED Lights
  • Auto-dimming door mirrors
  • Bumpers: body-color
  • Heated door mirrors
  • Power door mirrors
  • Spoiler
  • Turn signal indicator mirrors
  • Advanced Real-Time Traffic Information
  • Apple CarPlay Compatibility
  • Auto-dimming Rear-View mirror
  • BMW Assist eCall
  • BMW TeleServices
  • ConnectedDrive Services
  • Driver door bin
  • Driver vanity mirror
  • Front reading lights
  • Garage door transmitter
  • Hands-Free Bluetooth & USB Audio Connection
  • Heated Steering Wheel
  • Illuminated entry
  • Leather Shift Knob
  • Outside temperature display
  • Passenger vanity mirror
  • Rear seat center armrest
  • Remote Services
  • Speed Limit Info
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • WiFi Hotspot
  • Wireless Charging
  • Dakota Leather Upholstery
  • Front Bucket Seats
  • Front Center Armrest
  • Heated Front Seats
  • Heated front seats
  • M Sport Seats
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 19" x 9" Fr & 19" x 10" Rr M Forged
  • Wheels: 19" x 9" Fr & 19" x 10" Rr M Forged Black
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.