Weir Canyon Honda

8323 E La Palma Ave Anaheim, CA 92807

2019 BMW M4 Base at Weir Canyon Honda

2019 BMW M4 Base

Selling Price : $49,995

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M4
  • Condition : Used
  • Mileage : 47,297
  • VIN : WBS4Y9C58KAG67655
  • Stock # : 00422818
  • Engine :
  • Transmission : 7-Speed Automatic
  • Ext. Color : Orange
  • Int. Color : BLACK
  • Vehicle Type : Coupe
  • Body Style : 2D Coupe
  • Drivetrain : RWD
City MPG * 17 Hwy MPG * 23

*Your mileage will vary depending on driving conditions, how you drive and maintain your vehicle, battery-pack age/condition, and other factors.

The 2019 BMW M4 is a stunning vehicle that combines luxury, performance, and advanced safety features, making it a top choice for driving enthusiasts. With its powerful 3L I-6 gasoline direct injection engine, delivering an impressive 425HP through a smooth 6-speed manual transmission, the M4 ensures an exhilarating driving experience.

One of the standout features of the M4 is its focus on safety. The **forward collision mitigation** system exemplifies this commitment. It actively monitors the road ahead and prepares to intervene if it detects an impending collision, helping to reduce the severity of accidents. Paired with **front pedestrian impact prevention**, this system enhances the vehicles ability to identify and track pedestrians, taking proactive measures to avoid potential impacts. These features not only provide peace of mind but also reflect BMWs dedication to driver and pedestrian safety.

The M4 also includes practical features such as a **rear camera** for improved visibility while reversing. This camera provides enhanced images of obstacles that may be hidden from view, acting as an extra set of eyes to ensure your safety. Additionally, the **lane departure prevention** system helps keep the vehicle centered in its lane, automatically correcting any unintended movements. This feature is invaluable for reducing the risk of accidents caused by driver distraction.

For those long drives, the **cruise control with steering wheel mounted controls** allows for a stress-free experience. You can maintain a consistent speed without the need for constant pedal pressure, reducing fatigue on longer journeys. The **voice-activated integrated navigation system** further enhances convenience, guiding you effortlessly to your destination without the hassle of physical maps or detours.

Comfort isnt overlooked in the 2019 M4, with **heated driver and front passenger seat cushions** providing warmth during colder weather, making every journey enjoyable. The **touchscreen** interface simplifies access to various features, allowing you to control settings with just a swipe of your finger.

In conclusion, the 2019 BMW M4 is a remarkable vehicle that excels in performance, safety, and comfort. With its robust engine and an array of innovative features, it stands out as a premier choice for those seeking a blend of luxury and excitement on the road. Whether youre navigating city streets or cruising along the highway, the M4 ensures a driving experience like no other.

Our dealership is your top choice for quality vehicles, serving Irvine, Riverside, San Bernardino, Yorba Linda, Anaheim Hills, and Corona with a vast selection and exceptional customer service. Discover unbeatable prices and flexible financing options that make finding your perfect car in Southern California both easy and enjoyable.

Dealership Info:

Weir Canyon Honda

Weir Canyon Honda

Vehicle Features

  • Wheels: 18" x 9" Fr & 18" x 10" Rr M V-Spoke
  • Wheels: 20" x 9" Fr & 20" x 10" Rr Forged
  • Wheels: 20" x 9" Fr & 20" x 10" Rr Forged Black
  • Heated Front Seats
  • Cloth/Leather Upholstery
  • Radio: AM/FM Audio System
  • Competition Package
  • Heated Steering Wheel
  • Wireless Charging
  • Automatic Start/Stop Function
  • Power Front Seats
  • Lumbar Support
  • HD Radio
  • SiriusXM Satellite Radio
  • harman/kardon Surround Sound System
  • BMW Assist eCall
  • BMW TeleServices
  • ConnectedDrive Services
  • Advanced Real-Time Traffic Information
  • Remote Services
  • Apple CarPlay Compatibility
  • Hands-Free Bluetooth & USB Audio Connection
  • WiFi Hotspot
  • Extended Shadowline Trim
  • Competition Package (7MA)
  • M Competition Package
  • Enhanced USB & Bluetooth
  • 4-Wheel Disc Brakes
  • Emergency communication system: BMW Assist eCall
  • harman/kardon® Speakers
  • Exterior Parking Camera Rear
  • Apple CarPlay
  • AM/FM radio: SiriusXM
  • 16 Speakers
  • Speed-Sensitive Wipers
  • Auto-dimming Rear-View mirror
  • Front beverage holders
  • Variably intermittent wipers
  • Turn signal indicator mirrors
  • Trip computer
  • Traction control
  • Tilt steering wheel
  • Telescoping steering wheel
  • Steering wheel mounted audio controls
  • Sport steering wheel
  • Split folding rear seat
  • Speed-sensing steering
  • Speed control
  • Security system
  • Remote keyless entry
  • Rear window defroster
  • Rear seat center armrest
  • Rear reading lights
  • Rear anti-roll bar
  • Rear air conditioning
  • Rain sensing wipers
  • Radio data system
  • Power windows
  • Power steering
  • Power passenger seat
  • Power driver seat
  • Power door mirrors
  • Passenger vanity mirror
  • Passenger door bin
  • Panic alarm
  • Overhead airbag
  • Outside temperature display
  • Occupant sensing airbag
  • Memory seat
  • Low tire pressure warning
  • Leather steering wheel
  • Knee airbag
  • Illuminated entry
  • Heated front seats
  • Heated door mirrors
  • Garage door transmitter
  • Fully automatic headlights
  • Front reading lights
  • Front dual zone A/C
  • Front anti-roll bar
  • Four wheel independent suspension
  • Dual front side impact airbags
  • Dual front impact airbags
  • Driver vanity mirror
  • Driver door bin
  • Delay-off headlights
  • DVD-Audio
  • CD player
  • Bumpers: body-color
  • Brake assist
  • Automatic temperature control
  • Auto-dimming door mirrors
  • Alloy wheels
  • Adaptive suspension
  • ABS brakes
  • Tachometer
  • Navigation System
  • Leather Shift Knob
  • Front Center Armrest
  • Front Bucket Seats
  • Electronic Stability Control
  • Air Conditioning

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.